System-by-System Assembly
Mechanical alignment, hydraulic connections, electrical installation and control setup are checked before the systems are tested together. Components and options must match the approved order.
A standalone machine goes through functional testing after assembly. On an automated line, the test also follows a blank across machines: sheet detection, transfer, position confirmation and restart after an interrupted handoff. Record the sample part and pass criteria in the test plan.